ESPC Travaux divers
ESPC Travaux divers
Request a Quote

Industrial electrical

Company electrical audit in Tetouan: what to check and in which order

A professional electrical audit in Tetouan tells you whether the main board, sub-boards and protection still match the real load of a factory, hotel or warehouse — before a fault or a fire.

When to ask

Ask if boards run hot, trip often, have not been inspected for years, or if you are expanding a workshop (Martil-road industrial zone, Tetouan Park, Tetouan Shore). It is also the right first step before an installation quote.

What we inspect

Main and distribution boards, tightening, RCDs, voltage and current, hot spots, lighting and power outlets, drawings. Industrial sites add machine feeders and protection sizing.

Deliverable

A written status: what is sound, what is urgent, and a priced work plan. ESPCC can then install or maintain — we do not sell a package before the diagnosis.

Coverage

Tetouan, industrial zone, Tetouan Park, Martil, M'diq, Fnideq and Cabo Negro.

Tetouan · Guides

Common questions

Is an audit legally required?

Moroccan rules depend on the building type. Even when it is not mandatory, an audit prevents downtime and electrical fires.

How long is the visit?

A simple office site: half a day. A workshop or plant often needs a full day.

Do you then upgrade the board?

Yes. Audit, installation and electrical maintenance stay on the same file.

Let us keep your business running.

Tell us what your facility needs. The team will assess the requirement and recommend the appropriate technical solution.